Best Practices for Optimal Scheduling and Activities Sequencing on Brownfield Projects

Ahmed S. Alsaedi

Abstract: This paper provides an in-depth analysis of the challenges and best practices for effective scheduling and activity sequencing within the context of brownfield projects, which are characterized by unique challenges due to their nature of modifying or expanding existing operational facilities. The paper begins with an introduction to brownfield projects, providing briefing of the challenges in managing such projects. It then explores the criticality of project scheduling, which forms the backbone of successful project management, before discussing the crucial role and benefits of optimal activity sequencing throughout the project life cycle. The paper further explores comprehensive set of the best practices and strategies for scheduling and sequencing, including a detailed understanding of the project scope, application of the Critical Path Method (CPM), resource leveling and risk management. The paper also highlights the importance of real-time data incorporation, effective communication, and promoting a culture of continuous learning and improvement. These practices, when combined, can significantly enhance decision-making processes, foster teamwork, and facilitate project success.

A range of tools and techniques were explored that can be instrumental in achieving optimal scheduling and activities sequencing. These include Primavera P6, Work Breakdown Structure (WBS), AI and Machine Learning integration, PERT diagrams, Network Diagrams, and Gantt Charts offering a comparative analysis of their effectiveness. Each tool is discussed in terms of its functionality and applicability to Brownfield projects.

The paper concludes by re-emphasizing the necessity of these best practices and tools for managing Brownfield projects effectively. It asserts that successful project management in such complex environments requires a blend of strategic planning, effective communication, and the right set of tools. The paper serves as a guide for project Management professionals, offering valuable insights and practical solutions for successfully navigating the complexities associated with Brownfield projects.

Keywords: activity sequencing, brownfield projects, project life cycle. Critical Path Method (CPM).

Title: Best Practices for Optimal Scheduling and Activities Sequencing on Brownfield Projects

Author: Ahmed S. Alsaedi

International Journal of Mechanical and Industrial Technology      

ISSN 2348-7593 (Online)

Vol. 11, Issue 1, April 2023 - September 2023

Page No: 23-29

Research Publish Journals

Website: www.researchpublish.com

Published Date: 21-August-2023

DOI: https://doi.org/10.5281/zenodo.8268040

Vol. 11, Issue 1, April 2023 - September 2023

Citation
Share : Facebook Twitter Linked In

Citation
Best Practices for Optimal Scheduling and Activities Sequencing on Brownfield Projects by Ahmed S. Alsaedi