NUMERICAL ANALYSIS OF THE LA SARCELLE POWER PLANT: A CASE STUDY

Normand Thibeault, Ricardo Pena-Rodriguez

Abstract: La Sarcelle is part of the Eastmain-1-A/La Sarcelle/Rupert project and it is the first bulb units power plant of Hydro-Québec commissioning in 2013. The power plant is made of 3 large bulb units of 50 MW with a large runner diameter of 7 meters. The owner and the lead consultant had to deal with a new kind of plant introducing strong technical challenges. This implies for the consultant a large R&D component to complete the work, not only to control the bulb plant knowledge, but also to apply this knowledge to a Nordic climate. This paper presents an overview of the structural analysis process: the team work, the finite element models involved for global and local analysis, the loads applied to the critical concrete parts and the tools available in post-processing to understand the structural behaviour of complex structures.

Keywords: Bulb power plant, Finite element models, Graphical post-processing

Title: NUMERICAL ANALYSIS OF THE LA SARCELLE POWER PLANT: A CASE STUDY

Author: Normand Thibeault (Senior Engineer, AECOM, Montreal, Canada) and

Ricardo Pena-Rodriguez (Senior Engineer, Hydro-Québec, Montreal, Canada)

International Journal Of Civil And Structural Engineering Research (IJCSER)

Research Publish Journals

Vol. 1, Issue 1, Oct 2013 - March 2014